Touring Celebrity EPA Job at Critical Path Advisors, New York, NY

bWRKcFJXSDVmWGVkZU0yaWM3eWJ2eWpQVEE9PQ==
  • Critical Path Advisors
  • New York, NY

Job Description

Job description

Touring Celebrity Executive Personal Assistant (Extensive Travel Required)

Location: NYC-based with domestic and international travel

Salary Range: $125,000 – $150,000

The Celebrity Executive Assistant provides high-level administrative and personal support to a high-profile individual. This hybrid role requires a hands-on, adaptable, and discreet professional who can seamlessly manage both household and travel logistics while collaborating with the individual’s management and executive team on business matters.

This position involves extensive domestic and international travel , including a travel across Europe , and requires the ability to operate effectively in fast-paced, ever-changing environments.

Key Responsibilities:

  • Maintain and manage the individual’s personal and professional calendar, ensuring daily accuracy.
  • Book, coordinate, and manage all aspects of complex travel itineraries (air, ground, lodging, dining), with an emphasis on European travel preferences .
  • Oversee all elements of household operations, including supervision of house staff, scheduling repairs and maintenance, and ensuring the residence is always guest-ready.
  • Coordinate medical and personal appointments, prescriptions, and related needs.
  • Run personal errands, source products and services, manage mail, deliveries, returns, and household inventories.
  • Set up and manage organizational systems for the household and personal affairs.
  • Communicate with the business manager and external stakeholders as needed.
  • Maintain discretion, confidentiality, and professionalism at all times.
  • Actively manage communications, including email correspondence and follow-ups.
  • Execute additional duties as requested with a no-task-too-small attitude.

Required Experience:

  • Minimum 3 years of experience as a Celebrity or High-Net-Worth Individual Personal Assistant
  • Prior experience supporting a principal on tour, especially internationally (Europe experience required)

Requirements & Qualifications:

  • Must possess a valid driver’s license and active passport
  • Willingness and ability to travel extensively, including extended international assignments
  • Tech-savvy and quick to learn new systems and tools
  • Exceptional organizational, problem-solving, and multitasking abilities
  • Strong sense of accountability, discretion, and reliability
  • Highly proactive, detail-oriented, and able to anticipate needs
  • Excellent communication skills, both written and verbal
  • Comfortable working independently with minimal supervision
  • Flexible, calm under pressure, and able to pivot in dynamic situations

To Apply:

Applications must include the following to be considered:

  • A short video bio introducing yourself and highlighting relevant experience
  • A letter of reference or recommendation
  • Your resume

Please note: Interviews will not be scheduled unless all three items are submitted.

If interested, please send your complete application package to:

rdiamond@criticalpathadvisors.com

Job Type: Full-time

Pay: $125,000.00 - $150,000.00 per year

Job Tags

Full time, Flexible hours,

Similar Jobs

Pixocial Technology (Singapore) Pte. Ltd.

Applied Researcher Job at Pixocial Technology (Singapore) Pte. Ltd.

 ...engineers for the company.Our research topics spans image and video editing and generation, 3D editing, generation, and reconstruction,...  ...the frontier through seminal research and work closely with internal partners to deliver impactful products.Role Overview:We are... 

Good Samaritan

CMAII - Full Time Days - LTC Job at Good Samaritan

 ...preparation and dining, while creating a positive dining experience for the resident. May assist residents with meals and snacks; provide water and supplements as appropriate. Administers prescribed medications as delegated by a licensed nurse and within their scope of... 

Paperless Post

Junior Graphic Designer Job at Paperless Post

Paperless Post is seeking a talented Junior Graphic Designer/Illustrator with strong illustration and design fundamentals. This individual will possess a flexible skillset and a sophisticated yet playful aesthetic, enabling them to create design-forward event pages and... 

Beaumont Health

Patient Transporter Job at Beaumont Health

 ...Beaumont Health - Niles [Nursing Assistant / Health Aide] As a Patient Transporter at Beaumont Health, you'll: Practice safe lifting and techniques, transport patients by assisting patients in and out of cars, lifting patients on and off beds; Transport medications,... 

Spencer Britt

Neurosurgery Opening southwest of Bristol, TN - High volume, growing practice (Johnson City) Job at Spencer Britt

 ...volume, established practice # Adult Population # Two dedicated Neurosurgery Suites # Latest technology available including Medtronic Stealth Navigation, Medtronic O Arm, Mazor X Spine Robotics, NICO/Brainpath Technology # No State Income Tax Community:...